摘要 以重庆港果园作业区二期扩建工程6号高陡填方边坡设计为例,介绍如何结合地形、地质和占地条件,以极限平衡理论为基础采用Bishop方法对不同坡率、填料的高陡填方加筋边坡进行稳定性分析,并据此拟定经济实用的设计方案,然后通过离心模型试验对拟定方案的安全性进行验证后确定设计方案,最后通过施工期监控量测结果来检验设计方案的安全可靠性,以期为港口陆域工程和道路工程高陡填方边坡治理提供切实可行的借鉴方法。 Taking No. 6 high and steep slope design of the second phase extension project of Chongqing port orchard work zone for example, we introduce the way of combining topography, geology and land occupation condition to carry out stability analysis on high and steep reinforcement fill slope using the method of Bishop on the basis of limit equilibrium theory, and accordingly make economical and practical design scheme.The design scheme can be confirmed after the security is validated by centrifugal model test. Finally, we examine the safety and reliability of the design scheme by monitoring measurement results in the construction period, to serve as reference for high and steep fill slope treatment in harbor land area engineering and road engineering.
出处 《水运工程》 北大核心 2016年第6期154-158,共5页 Port & Waterway Engineering
关键词 陆域 道路 高陡边坡 加筋边坡 极限平衡 离心模型试验 land area road high and steep slope reinforcement slope limit equilibrium theory centrifugal model test
  • 相关文献

参考文献5

  • 1JTG D30-2015,公路路基设计规范[S].
  • 2交通部第二公路勘察设计院.公路设计手册路基[M].2版.北京:人民交通出版社,1996.
  • 3GB50330-2013 建筑边坡工程技术规范[S].2013.
  • 4长江水利委员会长江科学院.重庆港主城港区果园作业区二期扩建工程加筋边坡离心模型试验研究[R].武汉:长江水利委员会长江科学院,2012.
  • 5重庆市勘测院.重庆港主城港区果园作业区二期扩建工程边坡监测报告(第1~23期)[R].重庆:重庆市勘测院,2013.

共引文献83

同被引文献18

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部