长沙世茂塔楼基础设计研究 被引量:2

Research on foundation design of Changsha Shimao tower
原文传递
导出
摘要 主要介绍了长沙世茂塔楼基础设计的关键技术,包括采用带扩大头的人工挖孔桩,应用椭圆形桩来优化桩的布置,采用有限元软件ETABS分析基础筏板的内力以及布桩荷载的取值等。结果表明,合理的桩布置可以优化基础设计;布桩时竖向荷载取值应考虑水平力产生的不利作用。另外,对人工挖孔桩的施工注意事项进行了阐述。 The main technical issues on the foundation design of Changsha Shimao tower were introduced,such as adopting manually excavated pile with expanding head,applying oval-shaped piles to optimize pile layout,adopting FEA software ETABS to analyze the internal forces of raft foundation,as well as determination of values of pile loadings. The results show that reasonable arrangement of the pile can optimize the foundation design. It is also indicated that the negative effect of horizontal force should be taken into consideration in vertical loading value determination in pile layout. In addition,construction items of manual excavated pile were also presented.
出处 《建筑结构》 CSCD 北大核心 2016年第12期28-32,共5页 Building Structure
关键词 人工挖孔桩 椭圆形桩 桩筏基础 manually excavated pile oval-shaped pile piled raft foundation
  • 相关文献

参考文献3

  • 1刘灿,陆道渊,路海臣,等.长沙世茂塔楼结构设计[C]//第二十三届全国高层建筑结构学术交流会论文集.广州,2014.
  • 2建筑地基基础设计规范GB 50007-2011[S].北京:中国建筑工业出版社,2012.
  • 3建筑桩基技术规范JGJ94-2008[S].北京:中国建筑工业出版社,2008.

共引文献17

同被引文献11

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部