摘要
黑沙村隧洞主体工程完工后发现部分结构缝出现渗水现象,文中提出了结构缝处理方案,该设计理论上能彻底解决结构缝渗水问题,为类似工程问题提供参考和借鉴。
Heishacun Water seepage was found after the completion of the principal part of the tunnel at some structural joints.The treatment plan proposed in this paper can completely solve the water seepage problem at the structural joints technically and provide reference for similar projects.
出处
《水科学与工程技术》
2016年第3期68-69,共2页
Water Sciences and Engineering Technology
关键词
隧洞
结构缝
渗水
处理
tunnel
structural joint
seepage
treatment