摘要 本文以湖北河网区域的特高压输电线路水域承台为研究对象,通过对国内成功实施的钢板桩围堰工程进行调查分析,结合工程特点,对河网区域特高压线路水域承台施工的钢板桩围堰布置时应考虑的围堰高度、外形、尺寸、封底、支撑布置等工程要素进行分析,为河网区域特高压线路的水域承台施工提供技术参考。 Water cap of UHV transmission line of Hubei river area is studied in this paper, basedon the investigation and analysis of the steel sheet pile cofferdam, combining engineering characteristics, the engineering elements of cofferdam shape, size, height, cofferdam, bottom support layoutto be considered during construction are analyzed, which provides technical reference for water area pile cap construction for UHV transmission line in river network area.
出处 《湖北电力》 2016年第2期38-42,共5页 Hubei Electric Power
关键词 特高压输变电线路 钢板桩围堰 水域承台 要素分析 UHV transmission line steel sheet pile cofferdam bearing platform element analysis
  • 相关文献

参考文献9

二级参考文献42

共引文献48

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部