摘要 2014年,黄源芳撰文称吴震寰是中国近代水轮机设计第一人。经考证,在1942年吴震寰设计、重庆民生机器厂制造2×1000马力水轮机之前,中国已另有他人设计、制造了近代水轮机。他们分别是:纪廷洪,1940年前为福建顺昌白龙泉水电站等设计了多台近代水轮机;韩子揆,1935年为四川金堂玉虹桥水电站设计了40千瓦混流式水轮机;上海机器厂,1941年前已生产多种型式的近代水轮机。此外,中央机器厂第四分厂王守泰等人设计近代水轮机的时间也早于吴震寰,但其系列产品的生产则晚于1942年。本文是对现有研究的更正与补充,是对中国近代水轮机历史发展的进一步考证及梳理。 The current Chinese regulation doesn’t state the financial analysis contents of BT project with joint investment from government and enterprise, which shall comprise the feasibility study report of the BT pro-ject. In this paper, by investigating the financial analysis rule of government investment and considering the char-acteristics of joint investment, the respective input amount of government and enterprise in project shall be planned, and then the annualANC, ICR,DSCR,LOAR and enterprise’s FIRR of project shall be calculated. The relevant financial indicators of BT project shall be subject to financial requirement, otherwise, the input amount of government and enterprise shall be adjusted. In the end of this paper, by taking the Student Apartment of E Uni-versity as an example, the financial analysis process is introduced, by which the preparation, review and approval of feasibility study report of BT project shall be guided in the future.
作者 史晓雷
出处 《工程研究(跨学科视野中的工程)》 CSCD 2016年第3期307-312,共6页 JOURNAL OF ENGINEERING STUDIES
基金 中国科协老科学家学术成长资料采集工程项目(编号:2013-G-Z-HLJ03) 哈尔滨师范大学应用对策项目(编号:SYD-2014-01)
关键词 水轮机 自主设计 吴震寰 BT project financial scheme joint investment feasibility study student apartment project
  • 相关文献

参考文献8

二级参考文献56

共引文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部