期刊文献+

IPD模式下工程项目信任机制的构建研究 被引量:2

Research on Trust Mechanism Construction of Engineering Project under IPD Mode
下载PDF
导出
摘要 IPD模式因其将建设项目团队成员的知识和能力进行集成,可提高效率,节约投资,成为了建设项目交付的一种主流趋势。本文基于IPD模式理论,针对工程项目信任机制为利益相关方提供了"行为路线"。研制结果表明,将IPD模式应用于建筑工程项目的集成管理是合理的。 IPD mode integrates knowledge and ability of the team members of the construction project, improving efficiency, saving investment, and has become a mainstream trend of construction project delivery. Based on IPD theory, according to the project trust mechanism, this paper provides "course of action" for the stakeholders. The results show that it is reasonable to apply the IPD model to the integrated management of the construction project.
出处 《价值工程》 2016年第20期236-237,共2页 Value Engineering
基金 浙江省教育厅科研项目基金资助 项目名称:IPD模式下工程项目信任机制的构建研究(编号:Y201432373)
关键词 工程项目 IPD模式 信任模型 engineering project IPD model trust model
  • 相关文献

参考文献2

二级参考文献22

  • 1王永军,董平.企业动态联盟决策支持系统研究[J].北京理工大学学报(社会科学版),2006,8(2):3-6. 被引量:2
  • 2魏光兴,余乐安,汪寿阳,黎建强.基于协同效应的团队合作激励因素研究[J].系统工程理论与实践,2007,27(1):1-9. 被引量:38
  • 3Rex Miller, Dean Strombom, Mark Iammarino, et al. The Commercial Real Estate Revolution [ M ]. Canada : John Wiley&Sons Inc ,2009.
  • 4Construction Industry Institute. Value of Collaboration [R]. UT Austin, 2009.
  • 5The American Institute of Architects. Integrated project delivery a guide [EB/OL]. [2010-10-30]. http://www. betterbricks, com/graphics/assets/documents/AIA- IPDGuide_2007. pdf.
  • 6Kent D C, Becerik-Gerber B. Understanding construc- tion industry experience and attitudes toward integrated project delivery[J]. Journal of Construction Engineer- ing and Management, 2010, 136 (8) : 815-825.
  • 7Lahdenperi P. Making sense of the multi-party contractu- al arrangements of project partnering, project alliancing and integrated project delivery [ J I. Construction Man- agement and Economics, 2012, 30(1): 57-79.
  • 8Ilozor B D, Kelly D J. Building information modeling and integrated project delivery in the commercial con- struction industry : a conceptual study [ J ]. Journal of Engineering, Project, and Production Management, 2012, 2(1): 23-36.
  • 9Novitski B B J. New AIA Agreements Support Integrat- ed Project Delivery[ EB/OL]. [ 2010-01-12 ]. http :/! www. chinabim, com/school/bim _ ipd/2010-01-11! 465. html.
  • 10Feniosky Pe a-Mora,Michael Li. Dynamic planning andcontrol methodology for design/build fast-trackconstruction projects[J] . Journal of ConstructionEngineering and Management, 2001, 127 ( 1 ): 1-17.

共引文献44

同被引文献5

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部