超高钢管混凝土高效施工技术研究 被引量:2

Research on Efficient Construction Technology for Ultra-High Concrete Filled Steel Tube
下载PDF
导出
摘要 沈阳茂业中心主塔楼高度311m,为钢管混凝土外框+劲性核心筒结构体系。为了实现超高钢管混凝土泵送顶升浇筑工艺的控制,从钢管混凝土配制、泵送压力控制与管路设计、泵送顶升截流装置设计以及钢管壁应力实时监控几个关键技术着手,既确保了施工质量,同时又兼顾了操作的便利性和施工速度。 The main tower of Shenyang Maoye Center is 311-meter high, with the structural system of concrete filled steel tube frame + reinforced core tube.In order to achieve controls over pump-transporting, lifting and pouring technology for ultra-high concrete filled steel tube, a series of key technologies have been applied to the construction, such as steel tube concrete preparation, pumping pressure control and pipeline design, pumping and lifting interception device design, and real-time monitoring of stress on steel tube wall, which not only have ensured the construction quality, but also have given considerations to easy operation and construction speed.
作者 李琰 范仙明
出处 《建筑施工》 2016年第6期717-719,共3页 Building Construction
关键词 超高层建筑 钢管混凝土 泵送顶升 施工技术 ultra-high -building concrete filled steel tube pumping and lifting construction technology
  • 相关文献

参考文献9

二级参考文献41

共引文献57

同被引文献6

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部