期刊文献+

基础测绘数据生产困难类别划分及经费定额方法研究 被引量:2

Research on the difficult categories differentiation and outlay allotment standard in basic surveying and mapping data production
下载PDF
导出
摘要 文中结合甘肃省基础测绘数据生产中实际情况,叙述了基础测绘数据生产困难类别的划分及经费计算的具体方法,并通过应用和实践,能够为省级基础测绘和地理国情普查、监测等类似任务划分和经费安排提供参考和依据。 In this paper, the concrete methods for difficult categories differentiation and outlay allotment standard in basic surveying and mapping data production were described with the actual situation of base surveying and mapping data production in Gansu province. , through the application and practice, the reference and basis for provincial basic surveying and mapping, geographic conditions survey, monitoring and similar task were provided.
作者 任旭斌
出处 《矿山测量》 2016年第3期57-60,122,共5页 Mine Surveying
关键词 基础测绘 困难类别 经费定额 basic surveying and mapping difficult categories outlay allotment standard
  • 相关文献

参考文献4

  • 1中华人民共和国财政部,国家测绘局.测绘生产困难类别细则[s].2009.
  • 2中华人民共和国财政部,国家测绘局.测绘生产成本费用定额[s].
  • 3中华人民共和国财政部,国家测绘局.测绘生产成本费用定额计算细则[s].
  • 4刘仁义,刘南.ArcGIS开发宝典[M].北京:科学出版社,2006.

共引文献14

同被引文献14

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部