摘要
对华能烟台八角电厂厂外输煤系统装卸工艺系统设计工作进行了整理回顾,针对圆管带式输送机布置方案、圆管带式输送机选型以及煤炭除大块方案进行了论述,以利于后续类似工程的参考与借鉴。
The technological design of outer coal handling system has been sorted out and reviewed, which applies to Huaneng Yantai Bajiao power plant. In addition, the discussion has been made for the type selection of pipe conveyor and the option of large-size removing system. The above study will provide references for the continuous similar projects.
出处
《港工技术》
2016年第3期17-20,共4页
Port Engineering Technology
关键词
输煤系统
圆管带式输送机
除大块装置
装卸工艺
coal handling system
pipe conveyor
large-size coal removing system
handling process