摘要 溢流重力坝设计和施工时需要计算并绘制堰面曲线及堰剖面图,关于堰顶为克-奥曲线的堰面曲线的连接计算已有文献介绍过,而关于堰顶为WES曲线的连接计算已有文献介绍,但繁琐且不够准确。据此,文章介绍堰顶为WES曲线的堰面曲线的计算与绘制,此方法比现有的各种方法都直接、方便、简单、准确。 The weir surface curve and weir section shall be calculated and mapped when the overflow gravity dam is designed and construc- ted. Calculation on connection of the weir surface curves is available when the weir top is of the CO curve. The connection calculation is also available when the weir top is of the WES curve but it is complicated and inaccurate. Therefore, calculation and mapping of the weir surface curve are introduced in this paper when the weir top is of the WES curve. This method is direct, convenient, simple and accurate than other calculation methods.
出处 《西北水电》 2016年第3期27-29,共3页 Northwest Hydropower
关键词 溢流坝 堰面曲线 简捷计算与绘制 overflow dam weir surface curve simplified calculation and mapping
  • 相关文献

参考文献7

二级参考文献5

  • 1武汉水利电力学院水动力学教研室.水力计算手册[M].北京:水利出版社,1980..
  • 2江西省水利科学研究所.中小型水库宽浅式溢洪道水力设计.水利科技,1978,.
  • 3数学题解辞典编辑委员会.数学题解辞典·平面解析几何[M].上海:辞书出版社,1983..
  • 4ИИ勃立瓦洛夫.解析几何学[M].北京:高等教育出版社,1956..
  • 5Chow Ven-Te. Open Channel Hydraulics[M]. 1959.

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部