摘要
介绍了某水利枢纽工程塑性混凝土防渗墙施工工艺流程,重点阐述防渗墙施工关键工序——成槽施工的要点。经检测取得了良好的防渗效果。
The construction technology and flow of plastic concrete cutoff wall of one project are introduced in the paper. It emphasizes the key procedure of the cutoff wall construction, namely, the key points for the slot building construction. By inspection, the cutoff wall achieves excellent cutoff effect.
出处
《西北水电》
2016年第3期52-55,共4页
Northwest Hydropower
关键词
水利枢纽
防渗墙
成槽施工
塑性混凝土
project
cutoff wall
slot-building construction
plastic concrete