砂层隧道预加固咬合桩施工技术与费用分析 被引量:2

Construction Techniques for and Cost Analysis of Secant Piles for the Pre-Reinforcement of Tunnels in Sand Strata
下载PDF
导出
摘要 大西铁路客运专线上白隧道全长1 717 m,全隧洞身范围均穿越不同厚度的干燥粉细砂层,存在涌砂、突砂风险。通过研究干燥粉细砂层的物理力学特性并经过方案比选,最终确定了以预加固咬合桩为核心技术的施工工艺。鉴于相关行业对此工艺无明确定额标准,文章对预加固咬合桩的施工工艺流程、施工难点等问题进行了阐述并重点对施工费用进行了单价分析,可供类似工程借鉴使用。 Considering that the Shangbai tunnel on the Datong-Xi′an passenger dedicated railway line, 1717 m in total length, is at risk of sand gushing caused by construction in the dry, fine siltstone strata of different thicknesses,the construction technique of using a secant pile for tunnel pre-reinforcement is proposed based on research per-formed on the physical and mechanical properties of this strata. A relevant scheme comparison and some relevant is-sues, such as the construction technology process and construction difficulties regarding the secant pile for pre-rein-forcement, are discussed in light of the absence of a clear professional quota standard for this technique, especiallyregarding the unit price of its construction cost.
作者 张茵涛
出处 《现代隧道技术》 EI CSCD 北大核心 2016年第3期195-201,共7页 Modern Tunnelling Technology
关键词 砂层 隧道 预加固咬合桩 施工技术 费用分析 Sand strata Tunnel Secant pile for pre-reinforcement Construction technique Cost analysis
  • 相关文献

参考文献4

二级参考文献18

  • 1张江全.水平旋喷施工工法技术分析[J].硅谷,2008,1(23):94-95. 被引量:2
  • 2汪思海.单线长大隧道有轨运输机械设备配套选型及其应用[J].铁道标准设计,2005,25(5):95-97. 被引量:9
  • 3李国良.桃树坪隧道试验段设计方案[R].兰州,2010.
  • 4关宝树.隧道工程施工要点集[M].北京:人民交通出版社,2002..
  • 5Oudit G Y,Kassiri Z,Sah R,et al.The molecular physiology of the cardiac transient outward potassium current (Ito) in normal and diseased myocardium[J].J Mol Cell Cardiol,2001,33:851-872.
  • 6TZ214-2005,客运专线铁路隧道工程施工技术指南[S].
  • 7.铁路隧道新奥法指南[M].北京:中国铁道出版社,1998..
  • 8TB10204--2002,铁路隧道施工规范[S].
  • 9李国良.桃树坪隧道试验段设计方案【R].兰州,2010.
  • 10GB5001—2002,混凝土结构设计规范[s].

共引文献30

同被引文献10

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部