紧邻立交桥的连续墙受力分析和安全性评价 被引量:3

Force analysis and security assessment of diaphragm walls adjacent overpasses
下载PDF
导出
摘要 以深圳地铁车公庙交通枢纽7&9号线车站深基坑工程为研究背景,选取典型的监测断面,埋置混凝土应变计,进行地下连续墙的内力测试,分析了连续墙在深基坑开挖过程中的内力变化规律,并对连续墙的安全性进行了评价,得到以下结论:随着基坑开挖深度的增加,地下连续墙的内力变化越发明显,基坑负二层和负三层开挖对连续墙的内力变化影响较大,应重点关注和监测;根据现场测试数据得到两侧地下连续墙的内力变化并非完全一致,主要受到紧邻基坑开挖和周边建筑物的影响;最后计算得到地下连续墙处于安全状态。 A typical measurement-section was selected,and concrete strain meters were embedded to make measurement for diaphragm walls on the construction of Station of Metro Line 79of Chegongmiao Station of Shenzhen Metro.The internal force change of diaphragm walls was discussed,and the reliability of diaphragm walls was evaluated.Results showed that with the increasing of the excavation depth of foundation pits,the variation of stresses of diaphragm walls was observable.According to the strain data from field measurement,safety factors of diaphragm walls were calculated,which turned out to meet national code.Meanwhile,it can be concluded that diaphragm walls were in the safe status.In the end,the variation relationship of their internal force,which would provide some references for the design and construction of similar projects in the future,was obtained.
出处 《土木建筑与环境工程》 CSCD 北大核心 2016年第3期12-17,共6页 Journal of Civil,Architectural & Environment Engineering
基金 国家自然科学基金(51378505 50808178) 中国中铁股份有限公司科技开发计划(2012-19)~~
关键词 地下连续墙 现场测试 弯矩 安全系数 diaphragm wall field measurement bending moments safety factor
  • 相关文献

参考文献15

  • 1EMILIOS M C, MELLO C P, GEORGIOS K K. Effects from diaphragm wall installation to surrounding soil and adjacent buildings [J]. Computers and Geotechnics, 2013, 53: 106-121.
  • 2GOH-ANTHONY T C, XUAN F, ZHANG W G. Reliability assessment of diaphragm wall deflections in soft clays [J]. Foundation Engineering in the Face of Uncertainty, 2013, 487-496.
  • 3WYJADLOWSKI M, PULA W, BAUER J. Reliability of diaphragm wall in serviceability limit states [J]. Archives of Civil and Mechanical Engineering, 2015, 288:1-9.
  • 4石钰锋,阳军生,白伟,张学民.紧邻铁路偏压基坑围护结构变形与内力测试分析[J].岩石力学与工程学报,2011,30(4):826-833. 被引量:79
  • 5王树英,阳军生,唐鹏,马玉辉,王文通.八车道明挖湖底隧道结构受力现场测试与安全性评价[J].土木工程学报,2014,47(11):120-127. 被引量:25
  • 6YASUSHI A, OSAMU K, OSAMU M, et al. A numerical study on ground displacement and stress during and after the installation of deep circular diaphragm walls and soil excavation [J]. Computers and Geotechnics, 2008, 35.. 791-807.
  • 7PAOLO F, FRANCESCO C. Seismic performance- based design of flexible earth-retaining diaphragm walls [J]. Engineering Structures, 2014, 78.. 57-68.
  • 8CHU E H, SC D, HU S. Design optimization of underground metro station diaphragm walls using numerical modeling [C]//Geo-Congress 2014 Technical Papers,ASCE, 2014.. 439-470.
  • 9NICOLETA M I, FARCAS V S, POP M. Design optimization of diaphragm walls [ J ]. Procedia Technology, 2015, 19 357-362.
  • 10LUIS S C, ANTONIO A, ALEJANDRO J. Bi-layer diaphragm walls : Experimental and numerical structural analysis [J]. Engineering Structures, 2013, 56 .. 154-164.

二级参考文献15

  • 1葛以衡.杭州西湖隧道工程Ⅰ标段施工技术[J].地下工程与隧道,2004(2):31-35. 被引量:2
  • 2吴小将,刘国彬,卢礼顺.基于深基坑工程测斜监测曲线的地下连续墙弯矩估算方法研究[J].岩土工程学报,2005,27(9):1086-1090. 被引量:44
  • 3中国土木工程学会.DBll/489-2007建筑基坑支护技术规程[S].北京:中国建筑工业出版社,2007.
  • 4CHARLES W W.Observed performance of multi-propped excavation in stiff clay[J].Journal of Geotechnical and Geoenvironmental Engineering,ASCE,1998,127(3):889-905.
  • 5中铁第四勘察设计院集团有限公司.深圳地铁5号线民治站勘察设计报告[R].武汉:中铁第四勘察设计院集团有限公司,2008.
  • 6张国亮,阳军生.紧邻铁路基坑设计与施工技术研究报告[R].深圳:中铁南方投资发展有限公司,2010.
  • 7中华人民共和国行业标准编写组.JGJ120-99建筑基坑支护技术规程[S].北京:中国建筑工业出版社,1999.
  • 8中华人民共和国国家标准编写组.GB50010-2002混凝土结构设计规范[S].北京:中国建筑工业出版社,2002.
  • 9DIMT5057-2009水工混凝土结构设计规范[S].北京:中国电力出版社,2009.
  • 10邓安泰,欧阳锦.南昌市青山湖隧道工程结构设计简述[J].地下工程与隧道,2008(4):36-38. 被引量:4

共引文献102

同被引文献25

引证文献3

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部