6Goodall R M, Kortum W. Mechatronic developments for railway vehicles of the future [ J ]. Control Engi- neering Practice, 2002 : 887 - 898.
7Carballeira J, Baeza L, Rovira A, et al. Technical characteristics and dynamics modelling of talgo trains [J]. Vehicle System Dynamics, 2008, 46:301 - 316.
8Yoichi Sugiyama, Hiroshi Matsubara, Shuichi Myojo, et al. An approach for real-time estimation of railway passenger flow[J]. QR of RTRI, 2010, 51(2) : 82- 88.
9M Bazant, A Kavivka. Artificial neural network as a support of platform track assignment within simulation models reflecting passenger railway stations [ C ]. in Proc. Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 2009:505 -515.
10Prabhat Shrivastava S L, Dhingra. Development of co- ordinated schedules using genetic algorithms [ C ]. in Proc. Journal of Transporlation Engineering, 2002:89 -96.