需要系数法计算发电机功率的实践应用 被引量:3

The Practical Application of Calculating the Power of Generator with Demanding Coefficient Method
下载PDF
导出
摘要 电站对于钻井平台或船舶来讲是动力的核心,正确选择发电机的容量非常关键,关系到平台的运营,如果发电机容量选择过大,会导致主电站带负荷率低,发电机组运行效率降低,浪费了资源;如果发电机容量选择过小,将无法满足电气设备的用电要求,电站会超负荷运行,发电机组本身也会加快老化,故障率升高。发电机容量的计算方法有多种,结合实际项目工况特点,采取合适的方法是计算的关键,本文将采用需要系数法对正在研发的新型钻修井平台的发电机功率进行计算。 Power station for drilling platform is very important,correct choice of generator capacity is critical,related to the operation of the platform.If the generator capacity is too large,the main power station will be with low load rate and the efficiency of power generation unit will be reduced,power resource will be wasted.If the generator capacity is too small,the demand of electrical equipment will not be met,power station will work under overload situation,and the aging speed will become faster,failure rate will rise.There are many methods to calculate the capacity of a generator,according to operation condition of practical project,taking an appropriate method is the point.The demanding coefficient method was used to calculate the generator power of the new type well intervention vessel which is being researched.
出处 《造船技术》 2016年第3期26-29,55,共5页
基金 青岛市黄岛区海洋科技专项项目:项目编号(2014-4-7) 课题名称:新型可移动钻修井单元(平台)WIV研发
关键词 发电机功率 新型钻修井平台 需要系数法 计算方法 负荷率 Generator power New type well intervention vessel Demanding coefficient method Calculation method Load rate
  • 相关文献

参考文献2

  • 1海洋石油工程设计指南编委会.海洋石油工程设计指南[M].北京:石油工业出版社,2007.
  • 2中国船舶工业总公司.船舶设计实用手册电气分册[M].北京:国防工业出版社,2013.

共引文献4

同被引文献14

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部