摘要
利用FLAC数值模拟软件对中泰公司12611-2综放面过断层期间顶底板应力、位移情况进行了数值模拟计算,为综采面过断层提供了科学指导和理论依据,保证了工作面安全高效生产。
The roof and floor pressure and displacement during 12611-2 fully mechanized mining face,in Zhongtai Company,passing through the fault was simulated by using simulation software FLAC.The result provided scientific guide and theoretical basis for fully mechanized mining face passing through fault,and it guaranteed the safety and effective production of working face.
出处
《中国矿山工程》
2016年第3期41-45,共5页
China Mine Engineering
关键词
综采工作面
过断层
FLAC
数值模拟分析
fully mechanized mining face
passing through fault
FLAC
simulation analysis