摘要
馈线自动化现场测试是配电自动化系统验收阶段的重要环节。采用混合注入测试法可以有效提高该环节的测试效率,显著减少对测试人员和测试设备的需求。文章首先系统阐述了该测试方法的主要内容以及测试系统的架构和功能。然后以常州某地区的配电自动化系统现场测试为例,详细介绍了混合注入测试法的测试步骤,实例验证了该方法的有效性。
Field test of feeder automation is the key process of the acceptance phase of distribution automation system. The mixed injection test method can effectively improve the test efficiency and reduce the requirement of the test personnel and test equipment. In this paper,the main content of the test method and the structure and function of the test system is systematically expounded. Taking a site acceptance test of the distribution automation system in Changzhou as an example,the test steps of the mixed injection test method are introduced in detail. The effectiveness of the test method is verified by this application example.
出处
《供用电》
2016年第6期7-11,共5页
Distribution & Utilization
基金
江苏省电力公司2016年重点科技项目(J2016064)~~
关键词
馈线自动化
测试技术
混合注入测试法
主站注入测试法
终端注入测试法
feeder automation
test method
mixed injection test method
host injection test method
terminal injection test method