期刊文献+

基于Fiexsim的动车组五级修仿真研究

Research of EMU level-five maintenance simulation based on Flexsim
下载PDF
导出
摘要 伴随着高速铁路的发展,动车组运营里程和开行量的不断增大,进入高级修阶段的动车组不断增加。如何根据现有的动车组五级检修方案,发现工艺流程中潜在的瓶颈工序,对检修方案做出优化调整,以满足当下不断扩大的检修需求,最终保证动车组运行安全已成为铁路局和轨道车辆制造企业关注的热点。本文针对动车组五级修工艺流程,以某检修中心装配车间设备布局为基础,通过构建五级修仿真模型,在Flexsim软件上实现了对真实检修系统仿真模拟的同时,分析和改善现有检修线存在的生产效能问题,具有很重要的理论研究和实际应用价值。 With the development of high-speed railway, EMU is continuously increasing in numbers and operating mileages, as well as the quantity of which needs advanced maintenance. According to the current EMU level-five maintenance program, it is a focus of attention for Railways and rail vehicle manufacturing enterprises to find a way out to achieve these goals: finding potential bottleneck process, making optimization adjustments for maintenance program, meeting the growing maintenance needs and ultimately ensuring the operation safety of EMU. In this thesis, based on the EMU level-five maintenance process, equipment layout of a repair center's assembly plant is the foundation. A level-five maintenance model is constructed. In this way,the real maintenance system is simulated by Flexsim software. At the same time, the production efficiency problems of the existing maintenance line can be analyzed and improved with importantly theoretical and practical value.
作者 张鹤 赵慧
出处 《电子设计工程》 2016年第13期34-37,共4页 Electronic Design Engineering
关键词 动车组五级修 工艺流程 FLEXSIM 生产线仿真 EMU level-five maintenance process flexsim production line simulation
  • 相关文献

参考文献6

  • 1傅八路,周智勇,黄小钢.武广铁路客运专线动车组运用效率与检修基地规模研究[J].铁道标准设计,2010,30(1):32-37. 被引量:7
  • 2Fisher Q J,Jolley S J.Treatment of faults in production simulation models[J].Geological Society, London, Special Publications.2007,292(1):219-233.
  • 3张节潭,程浩忠,胡泽春,马则良,张建平,姚良忠.含风电场的电力系统随机生产模拟[J].中国电机工程学报,2009,29(28):34-39. 被引量:89
  • 4Kaarsemaker J,Nienhuis U.Simulation of a maritime pre-fabrication process[C].Conference on Computer Applications and Information Technology in the Maritime Industries.Delft of Netherland,2006.
  • 5Al-Hinai S,Fisher Q J,Al-Busafi B,et al.Laboratory measurements of the relative permeability of cataclastic fault rocks: an important consideration for production simulation modelling[J].Marine and Petroleum Geology,2008,25(6):473-485.
  • 6杨湘龙,王飞,冯允成.仿真优化理论与方法综述[J].计算机仿真,2000,17(5):1-5. 被引量:35

二级参考文献35

  • 1夏清,王少军,相年德.时序负荷曲线下电力系统概率性生产模拟[J].中国电机工程学报,1994,14(3):21-28. 被引量:13
  • 2李林川,王锡凡,王秀丽.基于等效电量函数法的互联电力系统随机生产模拟[J].中国电机工程学报,1996,16(3):180-184. 被引量:16
  • 3朱祚云,孙健刚,毕毓良,潘思安.风力发电对上海电网的影响[J].上海电力,2007,20(1):30-33. 被引量:3
  • 4庞爱莉.风力发电场接入后对系统的影响[J].上海电力,2007,20(1):33-35. 被引量:19
  • 5韦有双.排序问题的优化算法研究及虚拟现实仿真:博士学位论文[M].北京航空航天大学,1999,6..
  • 6黄红选.离散事件系统摄动理论和单运行仿真优化研究:博士学位论文[M].北京航空航天大学,1997,9..
  • 7王锡凡.电力系统随机生产模拟的等效电量函数法[J].西安交通大学学报,1984,18(6).
  • 8Booth R R. Power system simulation model based on probability analysis[J]. IEEE Transactions on Power Systems, 1972, 91(1): 62-69.
  • 9Schenk K F, Misra R B, Wassos S, et al. A new method for the evaluating of expected energy generation and loss of probability [J]. IEEE Transactions on Power Systems, 1984, 103(2): 294-303.
  • 10Wang X. Equivalent energy function approach to power system probabilistic modeling[J]. IEEE Transactions on Power Systems, 1988, 3(3):823-829.

共引文献128

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部