斯坦纳树模型在含DG配电网规划中的应用 被引量:5

Steiner Tree Model for Distribution Network Planning With DG
下载PDF
导出
摘要 不确定性分布式电源的接入,给配电网规划带来新的挑战。首先将含分布式电源的配电网规划归纳为求解斯坦纳树问题,提出了一种新的配电网规划建模方法。其次通过DG供电分区的划定,将分区内的负荷节点处理为一个不接DG的负荷节点,消除DG对配电网规划的影响。针对斯坦纳树问题传统解法求解时间会随着斯坦纳点的规模成倍增加的缺陷,采用一种改进的粒子群优化(PSO)算法解决斯坦纳树N-P完全问题。结合54节点算例并与传统方法计算结果比较,验证了该方法的有效性。 The traditional distribution network planning methods are challenged by the access of the uncertain distribut-ed generation. Firstly,the distribution network planning with distributed generation is converted into solving the Steinertree problem and a new distributed network planning model is proposed. Secondly,through the delineation of DG powersupply region,the load buses in the region are processed into one load bus without DG,eliminating the effect of DG onthe distribution network planning. In order to solve the problem that the computing time multiplied as the Steiner nodesincreased,an improved particle swarm optimization(PSO)algorithm is proposed to solve the Steiner tree N-P completeproblem. Typical results of the traditional algorithm and the proposed algorithm are further illustrated and comparedthrough a real 54 nodes system to testify the effectiveness of the methods in this paper.
出处 《电力系统及其自动化学报》 CSCD 北大核心 2016年第6期62-67,共6页 Proceedings of the CSU-EPSA
基金 国家电网公司科技项目(5211011400BT)
关键词 分布式电源 配电网规划 斯坦纳树 供电分区 改进粒子群优化算法 distributed generation distribution network planning Steiner tree(ST) power supply region improved particle swarm optimization(PSO) algorithm
  • 相关文献

参考文献19

二级参考文献196

共引文献520

同被引文献66

引证文献5

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部