龙江水电站枢纽工程侧向漏斗式进水口设计 被引量:1

Design of Lateral Funnel-type Intake for Longjiang Hydropower Station Complex Project
下载PDF
导出
摘要 龙江水电站枢纽工程引水系统进水口经过进水口位置、形式、引水洞线方案布置比较及其前沿高边坡的稳定分析,最终选用侧向漏斗式进水口形式,成功地解决了高边坡可能不稳定导致进水口堵塞等问题,避开了断层对引水隧洞高压岔管部位的影响,且洞线布置更为平直、顺畅,水头损失更小。 By comparing intake position, intake type and diversion tunnel axis layout schemes and analyzing the stability of high slope in front of intake, the lateral funnel-type intake is finally chosen as the water diversion system intake of Longjiang Hydropower Station Complex Project. This intake design eliminates the risk of intake blocking caused by high slope instability, and makes the axis of tunnel more straight and smooth, the head loss more smaller. Meanwhile, the intake design can avoid the influence of fa.uhs on high-pressure bifurcated pipe of diversion tunnel.
出处 《水力发电》 北大核心 2016年第7期58-60,共3页 Water Power
关键词 侧向漏斗式进水口 水工模型试验 龙江水电站枢纽工程 lateral funnel-type intake hydraulic model test Longjiang Hydropower Station Complex Project
  • 相关文献

参考文献3

二级参考文献3

  • 1周德培,雷承第.杨涛.锦屏-级水电站工程区右岸CⅡ标工程边坡施工期动态稳定性及监测反馈分析[R].成都:西南交通大学,2009.
  • 2徐远杰,等.锦屏-级水电站厂房进水口分层取水设计专题报告附件三进水口三维有限元静动力分析报告[R].武汉:武汉大学,2007.
  • 3游湘.刘平禄,等.锦屏一级水电站厂房进水口分层取水设计专题报告[R].成都:中国水电顾问集团成都勘测设计研究院,2006.

共引文献2

同被引文献9

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部