摘要
研发了一种基于现有10kV相位铭牌的新型低压线路相位搭接模板,该模板可对低压线路施工时的核相工作带来帮助。介绍了模板的外部构造、内部结构、固定方式,并对实验室所提供的样品进行实验。通过仿实验分析表明,在正常低压台区改造作业中,相位搭接模板能够帮助核相人员提高核相速度,减少停电时间。
This research developed a new type of low voltage line phase bonding template based on the existing10 kV phase nameplate,which is conducive to the phase-checking during low-voltage line construction.This paper introduces the external and internal structure and fixing method of the template,and conducted experiment on the provided samples.The simulation experiment shows that the template can help personnel to increase phase-checking speed,and reduce the outage time in the normal low-voltage area reconstruction work.
出处
《电力与能源》
2016年第3期388-390,共3页
Power & Energy
关键词
相位标识
核相时间
供电可靠性
phase identification
phase-checking time
power supply reliability