液压测力器在水电站桥机荷载试验中的应用

Application of hydraulic dynamometer in bridge crane loading test
下载PDF
导出
摘要 国内桥机荷载试验中所需的试块一般采用借用的方式,但对于国外特别是欠发达地区的水电项目,试块的采购和运输费时、费力且不经济。针对上述问题,以越南松邦4水电站为例,介绍了利用液压测力器开展桥面荷载试验的基本原理、主要设备、试验步骤及第三方检测机构的检测过程。试验结果表明,液压测力器法能验证桥机各主要机构的技术参数和安全性能,可供国外水电项目的桥机荷载试验借鉴使用。 The test blocks used in bridge crane loading test in China are usually borrowed from other hydropower plants; however,in abroad especially less developed area,it is difficult and uneconomical to purchase and transport the test blocks. Aiming at this problem,taking the Song bung 4 hydropower plant in Vietnam as a case,the method of the bridge crane loading test by using hydraulic dynamometer is presented,and the basic working principle,main equipment,test procedure and testing process by the third- party organization are also introduced. The testing result shows that the method can verify the technical parameters and the safety performance of bridge cranes,which is a reference to other oversea hydropower projects.
出处 《人民长江》 北大核心 2016年第12期67-70,共4页 Yangtze River
关键词 桥机 荷载试验 液压测力器 松邦4水电站 bridge crane loading test hydraulic dynamometer Song bung 4 hydropower plant
  • 相关文献

参考文献4

二级参考文献2

  • 1中华人民共和国住房和城乡建设部.GB2010-12-01起重设备安装工程施工及验收规范[s].北京:中国计划出版社,2010.
  • 2中华人民共和国国家质量监督检验检疫总局.GB8918--2006钢丝绳国家标准[S].北京:中国标准出版社,2006.

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部