摘要 建筑节能改造项目风险共担具有耗散结构特性,基于对风险共担的系统解析,利用耗散结构理论,探讨既有建筑节能改造项目风险共担耗散结构的形成机理.在此基础上,构建了基于灰关联熵的风险共担结构演化方向判别模型,指出了风险共担结构的3种演化方向.最后,针对研究结果从推进协同治理、强化制度建设、合理设计契约3个方面提出建筑节能改造项目风险共担决策优化建议. Risk sharing structure in the existing reconstruction projects for building efficiency the characteristics of dissipative structure.The analysis of the risk sharing structure and the dissipative structure theory are applied for investigation of the formation mechanism of the risk sharing dissipative structure in the reconstruction project for building energy efficiency.On this basis,the direction discrimination model of risk sharing structure is constructed based on the grey relational entropy evolution model,and 3kinds of evolution direction of risk sharing structure are presented.Lastly,suggestions for promoting collaborative governance,strengthening regulation,and designing contract are proposed.
出处 《吉首大学学报(自然科学版)》 CAS 2016年第3期90-93,共4页 Journal of Jishou University(Natural Sciences Edition)
基金 国家自然基金资助项目(71171141) 天津市社科规划后期资助项目(TJGLHQ1403)
关键词 建筑节能 风险共担 耗散结构 演化方向 building energy efficiency risk sharing dissipative structure evolution direction
  • 相关文献

参考文献10

  • 1RUUSKA I,AHOLA T,ARTTO K,et al.A New Governance Approach for Multi-Firm Projects:Lessons from Olkiluoto 3and Flamanville 3Nuclear Power Plant Projects[J].International Journal of Project Management,2011,29(6):647-660.
  • 2LAURE ATHIAS.Local Public-Services Provision under Public Private Partnerships:Contractual Design and Contracting Parties Incentives[J].Local Government Studies,2013,39(3):312-331.
  • 3尹贻林,赵华,严玲.工程项目风险分担影响因素层次结构及作用机理研究[J].统计与决策,2013,29(8):175-178. 被引量:23
  • 4KHAZAENI G.KHANZADI M.AFSHAR A.Fuzzy Adaptive Decision Making Model for Selection Balanced Risk Allocation[J].International Journal of Project Management,2012,30(4):511-522.
  • 5MOURAVIEV N,KAKABADSE N K.Risk Allocation in a Public-Private Partnership:a Case Study of Construction and Operation of Kindergartens in Kazakhstan[J].Journal of Risk Research,2014,17(5):621-640.
  • 6湛垦华,沈小华.普利高津与耗散结构理论[M].西安:陕西科学技术出版社,1992:326.
  • 7周凌云,穆东,喻小贤.区域物流产业系统耗散结构的形成与演化方向辨别——以长三角地区为例[J].北京交通大学学报(社会科学版),2013,12(2):27-33. 被引量:8
  • 8杜亚灵,胡雯拯,尹贻林.风险分担对工程项目管理绩效影响的实证研究[J].管理评论,2014,26(10):46-55. 被引量:29
  • 9ATHENA ROUMBOUTSOS,KONSTANTINOS P.ANAGNOSTOPOULOS.Public-Private Partnership Projects in Greece:Risk Ranking and Preferred Risk Allocation[J].Construction Management and Economics,2008,26(7):751-763.
  • 10李存斌,陆龚曙.工程项目风险元传递的系统动力学模型[J].系统工程理论与实践,2012,32(12):2731-2739. 被引量:31

二级参考文献39

  • 1Raz T, Shenhar A J, Dvir D. Risk management, project success, and technological uncertainty[J]. R&:D Man-agement, 2002, 32(2): 101 -109.
  • 2Li C B, Fan L H, Guo Y, et al. The Analytic Model and its application of Generalized Project Risk Analysis[C]// Proceedings of 2004 International Conference on Construction & Real Estate Management, 2004: 229-231.
  • 3Li C B, Li X. The analytic model and its application of generalized project risk elements transmission[J]. Journal of Computational Information Systems, 2008, 4(2): 671-678.
  • 4Li C B, Wang K C. The risk element transmission theory research of multi-objective risk-time-cost trade-off[J]. Computers and Mathematics with Applications, 2009, 57(11 12): 1792-1799.
  • 5Rodrigues A, Bowers J. The role of system dynamics in project management[J]. International Journal of Project Management, 1996, 14(4): 213-220.
  • 6Li H, Love P E D, Drew D S. Effects of overtime work and additional resources Engineering, Construction and Architectural Management, 2000, 7(3): 211 -220.
  • 7Park M. Model-based dynamic resource management for construction projects[J] on project cost and quality[J] Automation in Construction 2005, 14: 585-598.
  • 8Wang Q F, Ning X Q, You J. Advantages of system dynamics approach in managing project risk dynamics[J] Journal of Fudan University: Natural Science. 2005.44(2): 201- 206.
  • 9Zou P X W, Zhang G M, Wang J Y. Understanding the key risks in construction projects in China[J]. International Journal of Project Management, 2007, 25(6): 601-614.
  • 10PRIGOGINE I. Introduction to Thermodynamics of Ir- reversible Processes (3rd ed) [ M]. New York: Inter- science Pub, 1967 : 112.

共引文献87

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部