期刊文献+

集装箱港口装卸工艺优化配置研究 被引量:2

Study on Optimal Configuration of Loading and Unloading Process in Container Ports
下载PDF
导出
摘要 文中分析了港口中使用的传统集装箱系统装卸工艺:岸桥+拖挂车,岸桥+跨运车,岸桥+集卡+龙门吊,并给出其工艺流程图;以总成本C总最小作为目标函数而建立装卸工艺优化配置模型;在某港口码头应用其配置模型,通过选定船泊位和年吞吐量,从而确定最优作业线条数,再根据给定的一条作业线的最佳机械配置标准,可确定出所需的机械配置标准。 This paper analyzes the loading and unloading process of traditional container such as shore bridge + articulated vehicle, shore bridge + straddle carrier and shore bridge + truck + gantry crane. Their process flow diagrams are given. Then the optimal allocation model of loading and unloading process is set up with the minimum total cost as objective function.Finally, the configuration model is applied in a certain port and pier. Selecting ship berths and throughput, the optimal operation line number is determined. According to the best mechanical configuration of the given line 1 standard, the required mechanical configuration standards can be determined.
作者 陈巍
出处 《机械工程师》 2016年第7期181-182,共2页 Mechanical Engineer
关键词 集装箱港口 装卸工艺 优化配置 container ports loading and unloading process optimal configuration
  • 相关文献

参考文献4

二级参考文献4

  • 1秦同瞬.港口装卸工艺实务[M].北京:高等教育出版社,2002.3.
  • 2包起帆.现代集装箱码头智能化生产关键技术.物流,2004,11.
  • 3于慧婷.集装箱装卸工艺系统优化方案的研究[C].中国港口集装箱码头2007年高峰论坛论文集,2007.
  • 4胡树威.全球集装箱和港口集装箱装卸桥生产现状和趋势[J].集装箱化,2002,13(5):28-30. 被引量:1

共引文献12

同被引文献7

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部