摘要
通过综合分析,分别计算了安家岭露天煤矿经济合理工作线长度、生产规模与技术可行的工作线长度,在此基础上研究了工作线长度、推进度和产量之间的关系,得出了该露天煤矿的目标产能下的工作线长度、推进速度及相关产量,并最终得出该露天煤矿最佳工作线长度。
Calculate the open-pit coal mine working line length by comprehensive analysis ,which is economic and reasonable for the scale of production and technology. The basis of which,the relationship between the working line length, propulsion and production was studied,and gave the working line length under the target capacity, the velocity and related production. Finally ,drew the conclusion of the best working line length of the open-pit coal mine.
出处
《煤炭技术》
CAS
北大核心
2016年第7期50-52,共3页
Coal Technology
关键词
露天煤矿
工作线长度
推进速度
open-pit coal mine
working line length
advancing speed