摘要
以天津市津南污水处理厂配套管网顶管工程为依托,在大管径顶管、长距离顶进、双排顶进、穿越高速公路、新型管材施工等方面进行深入探讨。针对顶管施工设备及方法的选择、施工中的控制技术及施工中的技术难题进行了多方面研究。
Relying on the pipe jacking project of the supporting pipe network for Tianjin Jinnan Wastewater Treatment Plant, the article further discusses the large-diameter pipe jacking, long-distance jacking,double-row jacking, crossing expressway and new pipe material construction. The article studies the selection of pipe jacking construction equipment and method, the control technology of construction and the technical difficulty of construction.
出处
《城市道桥与防洪》
2016年第7期226-228,23,共3页
Urban Roads Bridges & Flood Control
关键词
污水处理厂
顶管
施工技术
wastewater treatment plant
pipe jacking
construction technology