6HUANG Yi,HUANG Wen-jie,SHANG Yu-min.Cost Con-trol in the Design Stage of Transmit Electricity Projects Basedon Value Engineering Method[C].Proceedings of the 2009Second International Symposium on Knowledge Acquisitionand Modeling(KAM 2009),2009:308-311.
7CHEN Man-ying,LIU Zhong.Cost control method and itsapplication for construction project in the design phase[C].Proceedings of the 2011 International Conference on RemoteSensing,Environment and Transportation Engineering(RSETE 2011),2011:1073-1076.
8WANG Fei,YAN Ju-wei,SHEN Bing,et al.The Researchon Informatization of Construction Project Cost Control[C].Proceedings of the International Conference on InformationManagement Proceedings of the International Conference onInformation Management,2008:155-158.
9LUO Sheng,LU Yu-jie,PENG Yong,et al.Developing CostControl Information System in the Complex Project[C].BMEI2011—Proceedings 2011 International Conference on BusinessManagement and Electronic Information,2011:99-105.