本文详细介绍了在七浦塘拓浚整治工程阳澄湖枢纽中对500k V高压线铁塔支护施工的工作原理、设计方法、施工顺序及主要注意事项。
In the paper, working principle, design method, construction sequence and main precautions on 500kV high tension line iron tower support construction in Qiputang Tuojun Control Project Yangcheng Lake Hub are introduced in detail.
出处
《中国水能及电气化》
2016年第6期7-10,共4页
China Water Power & Electrification
关键词
铁塔
支护
灌注桩
水泥土搅拌桩
iron tower
support
bored concrete pile
cement-soil mixing pile