摘要
本文介绍了该项目通排风系统的风量平衡、通风柜面风速调试、区域负压调试的具体方法。分析了负压调试遇到的问题及原因,并对类似工程的开展提出了建议。
This article presents the air volume balance, face velocity of fume hoods and negative pressure commissioning of the ventilating systems in the project in the perspective of method. The problems and cause in negative pressure commissioning were analyzed, and the suggestions for similar project were given in this paper.
出处
《建筑热能通风空调》
2016年第6期79-81,9,共4页
Building Energy & Environment
基金
中国科学院战略性先导科技专项资助(No.XDA02000000)
关键词
实验室
调试
风量平衡
通风柜
负压
laboratory
commissioning
air volume balance
fume hood
negative pressure