城轨隧道下穿既有立交桥基础施工技术 被引量:5

Construction Technique of Urban Railway System Tunnels Under Crossing the Existing Overpass Foundation
下载PDF
导出
摘要 随着城市现代化进程的不断发展,城市轨道交通隧道穿越既有桥梁的情形越来越多,隧道施工时既要保证桥梁能够正常使用,又要确保工程顺利开展,而隧道开挖产生的地层变形和应力释放必然会对既有桥梁产生扰动,从而威胁桥梁的使用和安全,因此,探究采用合理防护措施和正确的隧道施工方法非常重要。本文结合莞惠城际轨道东江隧道下穿古塘坳互通立交桥工程,分析了该工程的施工难点和存在的主要风险,制定了合理可行的施工方案,采取基础加固以及弱振动爆破等技术安全顺利地完成了施工,解决了施工难题,可为同类工程提供借鉴。 With the development of urban modernization,there are more and more urban railway system tunnels under crossing the existing overpass.Both the normal use of the overpass and the smoothly development of the construction needs to be insured when the tunnel constructed.The stratum deformation and stress relief from the tunnel excavation will cause the overpass disturbance to threaten its use and security.So,it is very important to research the reasonable safeguard procedures and right tunnel construction method.This paper analyzes the construction difficulties and existing risks of the project of Dongjiang Tunnel of the Dongguan-Huizhou Intercity Railway which goes underneath the Gutangao Interchange,formulates feasible construction scheme,successfully completes the construction with foundation reinforcement and weak-vibration blasting,solves the construction puzzle and provides references for similar projects.
作者 刘清花
出处 《铁道建筑技术》 2016年第5期64-67,共4页 Railway Construction Technology
关键词 城轨隧道 下穿 立交桥基础 注浆加固 弱振动爆破 urban railway system tunnel undercrossing overpass foundation grouting reinforcement weak-vibration blas ting
  • 相关文献

参考文献9

二级参考文献16

共引文献47

同被引文献26

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部