装配式建筑全寿命周期风险因素识别方法 被引量:43

Risk Factor Identification Method of the Whole Life Cycle in Prefabricated Construction
下载PDF
导出
摘要 为丰富装配式建筑的理论研究,规避和降低风险,就其全寿命周期的决策、设计、构件生产和运输、施工、运营5个阶段进行分析,采用文献研读、实地调研和专家访谈法构建装配式建筑的风险清单,并运用熵权法识别各阶段的关键风险因素,以期为装配式建筑的风险评价与管理提供参考,同时为装配式建筑的风险因素识别提供以熵权法为基础的定量分析方法。 In order to enrich the theoretical research of the prefabricated construction,avoid and reduce risks,authors analyze the whole life cycle that includes the decision-making,design,component production and transportation,construction,operation stage and build the risk list by the way of literature study,on-the-spot investigation and expert interview. Then,the paper chooses the entropy method to identify the key risk factors of each stage so as to provide certain reference for the risk evaluation and management of the prefabricated construction. At the same time,it can provide a quantitative analysis method that is based on entropy method in order to identify risk factors of the prefabricated construction.
出处 《沈阳建筑大学学报(社会科学版)》 2016年第3期257-261,共5页 Journal of Shenyang Jianzhu University:Social Science
基金 住房和城乡建设部科学技术计划项目(2011-R3-27) 沈阳市城乡建设委员会基金项目(sjw2013-07)
关键词 装配式建筑 全寿命周期 熵权法 风险识别 prefabricated construction whole life cycle entropy method risk identification
  • 相关文献

参考文献9

二级参考文献36

共引文献305

同被引文献264

引证文献43

二级引证文献202

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部