摘要 用砂土液化的观点研究盾构穿越饱和砂质粉土引起的地表沉降机理进而用于解决实际工程问题。以迎宾三路超大型土压平衡盾构隧道为工程背景,在室内试验、现场试验和工程实践的基础上,提出并证明了超大型土压平衡盾构穿越砂性土层会引起砂土液化的观点,且针对性地采取了相应的工程措施,解决了超大型土压平衡盾构穿越砂性土层中遇到的开挖面失稳、注浆量失准、地表沉降失控的工程难题。 With a view to study liquefaction shield through the mechanism of surface subsidence caused by saturated sandy silt and solve practical engineering problems is a valuable attempt.In the background of a large diameter EPB shield tunnel,on the basis of laboratory tests,field tests and engineering practice,this paper proposed and demonstrated point of view that the large sandy soil pressure shield will cause soil liquefaction,and taken appropriate engineering measures to solve the super large earth pressure across the excavation face shield encountered sandy soil instability,grouting volume inaccurate,out of control surface subsidence engineering problems.
作者 周永习
出处 《施工技术》 CAS 北大核心 2016年第13期109-113,共5页 Construction Technology
关键词 隧道工程 盾构 超大型土压平衡盾构 砂土 液化 施工技术 tunnels shields large diameter EPB shield sandy ground liquefaction construction
  • 相关文献

参考文献8

二级参考文献33

共引文献228

同被引文献29

引证文献4

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部