期刊文献+

高层蜘蛛网式结构大跨度梁后张法预应力施工技术 被引量:4

Post-tensionied Prestressing Construction Technology of Spider Web Shaped Large Span Beam in Tall Building
下载PDF
导出
摘要 某工程主楼中心为核心筒结构,南北为2个小体量筒体结构,形成三筒体受力,筒体与筒体、核心筒体与框架柱布置放射形蜘蛛网预应力框架梁结构形式,受力结构对称,大跨度梁采用有黏结后张法预应力施工技术,有效提高建筑净高,重点介绍了预应力施工关键技术。 In some engineering,the center building was the core tube structure,the north and south of the engineering were two small tube structures,three tube structures forced.The radiation shaped spider webs prestressed frame beam structure were formed,the forced structure is symmetrical.The large span beam effectively improves the building height by applying the large span beam bonded prestress construction technology.This paper focuses on the application of the key technology of prestressed construction.
作者 柳立新
出处 《施工技术》 CAS 北大核心 2016年第13期138-140,143,共4页 Construction Technology
关键词 高层建筑 大跨度 预应力 施工技术 tall buildings large span prestressing construction
  • 相关文献

参考文献3

二级参考文献12

  • 1中国建筑科学研究院.GB/T14370-2007预应力筋用锚具、夹具和连接器[S].北京:中国标准出版社,2007.
  • 2中国建筑科学研究院.JG225-2007预应力混凝土用金属波纹管[S].北京:中国标准出版社,2007.
  • 3中国建筑科学研究院.GB50666-2011混凝土结构工程施工规范[s].北京:中国建筑工业出版社,2011.74 -75.
  • 4同济大学,中国建筑科学研究院.06SG429后张预应力混凝土结构施工图表示方法及构造详图[S].北京:中国计划出版社,2006.
  • 5东南大学华东预应力技术联合开发中心,中国建筑科学研究院结构所.CECS180:2005建筑工程预应力施工规程[S].北京:中国计划出版社,2005.
  • 6冶金工业部信息标准研究院.GB/T5224--2003预应力混凝土用钢绞线[S]北京:中国标准出版社,2003.
  • 7中国建筑科学研究院.GB50204--2002(2011年版)混凝土结构工程施工质量验收规范[s].北京:中国建筑工业出版社,2011.
  • 8东南大学华东预应力技术联合开发中心,中国建筑科学研究院结构所.CECSl80:2005建筑施工预应力施工规程[S].北京:中国计划出版社,2005.
  • 9中国建筑科学研究院.GB50204--2002混凝土结构工程施工质量验收规范[S].北京:中国建筑工业出版社,2011.
  • 10徐广林.后张法有黏结预应力施工技术研究[J].黑龙江科技信息,2013(15):199-199. 被引量:1

共引文献3

同被引文献24

引证文献4

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部