摘要
G3i仪器主程序升级至5.016版本后增加了多路径传输功能,其中包括增强的蛇形排列以实现冗余排列、二级排列、简化的交叉站跨站(Rptr FTU)设置。多路径传输功能在山地施工中的应用,使排列的布设、查线、采集中断线的恢复等环节更加简易灵活,减少了因为排列故障造成的停机时间,大大提高了工作效率。本文以某山地三维采集项目为例,介绍多路径传输设置方法及其应用实例。
The G3i's main program upgrade to version 5.016,including the enhancement of the Snake to realize redundant function(Loop),secondary arrangement(S-Link),simplified repeat FTU settings(Rptr FTU).Application of multipath transmission function in the mountain for the construction not only makes the arrangement layout,troubleshooting,recovery and so on link is more simple and flexible,but also greatly improves the efficiency and reduce the failure cause downtime.Taking one mountain 3D acquisition project as an example,this paper introduces multipath transmission setting methods and some application examples.