浅谈浮法玻璃企业的企业管理之五——浮法玻璃生产线的项目后评价

Discussion on Business Management of Float Glass Enterprise——Post project evaluation of float glass production line
下载PDF
导出
摘要 项目后评价是在项目完成后对项目的全过程进行后评价,通常包括项目前期阶段、工程建设阶段、生产运营阶段和项目社会环境的影响等评价内容。叙述了玻璃企业项目后评价的意义、主要内容、基本方法和主要技术指标,提出了一些针对性的建议,对浮法玻璃企业的冷修技术改造和项目建设有一定的参考价值和指导意义。 Post project evaluation means that an evaluation of overall process of the project was conducted after the project completion. The evaluation covers earlier stage of the project, engineering construction stage, production operation stage and social environment influence. The significance, main points, basic methods and main technical parameters of post project evaluation of glass factory were stressed. Some specific suggestions were presented. This article can be used as guidance and reference for glass company in cold repair technical transformation and project construction.
出处 《玻璃》 2016年第6期45-48,共4页 Glass
关键词 建设项目 浮法生产线 项目后评价 construction project float process line post project evaluation
  • 相关文献

参考文献1

二级参考文献2

  • 1全国注册咨询工程师(投资)资格考试参考教材编写委员会.工程咨询概论[M].北京:中国计划出版社,2007:155-159.
  • 2张三力.项目后评价[M].北京:清华大学出版社,2000.

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部