建设开发过程中经常遇到发包方原因造成的停工索赔问题,文章结合厦门某工程实例,从发包方的角度探讨了停工天数的确定、停工索赔的计算等问题,并对避免索赔提出了具体的建议。
There is often the problem of stoppage and claim for the cause of the contract in the process of construction. Combined with an engineering example in Xiamen,this paper discusses the determination of the number of downtime,the calculation of the work stoppage and other issues from the angle of the Developer's point of view,and specific recommendations are made on the avoidance of claims.