贵安综保区是贵州省第二个综保区,位于贵安新区马场产业发展区域,规划面积2.2 km^2,围网面积2.1 km^2,该项目为保税区中综合服务大楼,BIM技术以于项目开工阶段全面开展,BIM技术在综合服务大楼高大支模方面的应用,解决原有支模方案执行与展示方面遇到的问题,确保高大支模顺利安全准时地完成,为整个项目按时竣工助力。
Gui'an bonded area in Guizhou province is the second integrated free trade zone. The planning area is 2.2 km2, with an seine area of 2.1 km2. This project is a comprehensive service building in the free trade zone. BIM technology was carried out when the project started. This paper mainly introduces the application of BIM technology in the high support of the composite service building to solve the problems encountered in the implementation and demonstration of the original support scheme and to ensure the smooth,safe and punctual completion of the tall formwork for the entire project.
出处
《土木建筑工程信息技术》
2015年第5期35-38,共4页
Journal of Information Technology in Civil Engineering and Architecture
关键词
BIM
高大支模
方案模拟
安全
动画展示
BIM
High Large Formwork
Program Simulation
Safety