合同条款关于单元工程优良率质量要求的约定,以及工程建设市场竞争中关于企业业绩需求,干扰了水利工程项目单元工程质量等级评定成果,引起单元工程质量优良率无法准确反映实体质量,并对质检档案资料的准确性、真实性形成影响。通过分析各因素影响单元工程质量评定的途径和机理,提出建设性对策;并且延伸分析与单元工程质量控制密切相关的“三检制”难以落实的原因,和削减繁琐的“三检”资料必要性,从基层角度提出关于水利工程质量评价体系某些方面改进的建议。
;The excellent and good rate of unit project contract, and the engineering construction enterprise performance demand affected unit engi- neering water conservancy project quality level,resulting in excellent rate of unit project quality can not accurately reflect the entity quality, ac- curacy, and quality inspection of the authenticity of the data form influence, through the analysis of various factors influence the way and mecha- nism, put forward constructive countermeasures; and the extension analysis and unit project quality management related to the "three check" system, the necessity and cut red tape "three check" data,puts forward the quality of water conservancy project evaluation system improvement suggestions from the grassroots perspective.
出处
《南水北调与水利科技》
CAS
CSCD
北大核心
2015年第B02期218-220,共3页
South-to-North Water Transfers and Water Science & Technology
关键词
水利
单元工程
质量评价
改进
water conservancy
cell engineering
quality evaluation
improvement