摘要
根据加氢装置工艺流程的要求及工艺设备的特点,结合设计经验及建造时遇到的问题,对冷高分构架内循环氢脱硫塔及冷高压分离器配管设计进行详细论述和分析,总结了冷高分构架设计应注意的问题,并给出优化设计方案。
According to the characteristics of the process of hydrogenation device request and the e- quipment process, this paper discusses and analyzes the detailed piping design and the frame design for recycle hydrogen desulfurization tower and high pressure cold separator. With experience in de- sign and construction problems, the paper puts forward what should be paid attention to the problem of cold high architecture design, and gives the solution.
出处
《承德石油高等专科学校学报》
CAS
2016年第4期37-41,共5页
Journal of Chengde Petroleum College
关键词
加氢
冷高压分离器
循环氢脱硫塔
角阀
液位计
hydrogenation
high pressure cold separator
recycle hydrogen desulfurization tower angle valve
level gauge