沈阳地铁崇山站主体施工方案比选

Chongshan Subway station construction in Shenyang Metro
下载PDF
导出
摘要 论文以崇山车站实际工程为依托,通过对施工安全、施工质量、施工进度、工程数量的变化及经济效益等不同方面的比较,分析了崇山车站总体施工方案的确定,对中洞初支护扣拱施工方案做了重点分析。研究采用PBA工法,选择合理的施工分部、科学的开挖步序,减少了施工干扰,控制了地面沉降,保证了施工安全,加快了施工进度。 This paper is based on the practical engineering of the shallow buried metro station in Shenyang. 2D plastic finite-element model of PBA standard cross section is respectively established. Study is also done to compare different construction scheme of PBA method, and compare the construction effection of PBA method in different surrounding rock grades. Furthermore, owing to the reasonable Partition and the scientific excavation Procedures, we succeeded in reducing the constructing disturbance, controlling the ground settlement, ensuring the constructing safety and accelerating the construction speed.
作者 朱统步
出处 《四川水泥》 2016年第3期193-194,308,共3页 Sichuan Cement
关键词 地铁车站 洞桩法 PBA工法 方案比选 metrostation, Caven-PBA Method, PBA Method, project choose
  • 相关文献

参考文献3

二级参考文献7

  • 1Walter J Hinkel,etc. Underground Railways ‘yesterday today tomorrow' from 1863 upto the year 2000. compress verlag.
  • 2鐵道綜合技術研究所.シ-ルドトンネルの實例集[M].,1994,10..
  • 3于书翰 杜谟远.隧道施工[M].北京:人民交通出版社,1992..
  • 4(日)地盘工学会.設計から施工まで[M].,1997..
  • 5(日)地盘工学会.シ-ルド工法の调查[M].,1997..
  • 6(日)鉄道総合技術研究所.鉄道構造物等設計標準同解說[M](シ-ルドトンネル)[M].,平成9,7..
  • 7(日)地盘工学会.シ-ルドトンネルの新技术[M].,1995..

共引文献94

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部