本文重点探讨泰山抽水蓄能电站4号机组检修中上机架回装及中心调整的问题,提出了回装中便于机架调至理想中心位置的可行性建议,为今后类似工作提供价值参考。
This paper mainly discuss the problem of the reinstal ation of floating upper frame and center adjustment in the maintenance of unit 4 in Taishan power station. Putting forward a feasible suggestion for the frame returning to the ideal center position,and providing a valuable reference for a similar work in the future.
出处
《水电与抽水蓄能》
2016年第3期82-85,共4页
Hydropower and Pumped Storage
关键词
泰山抽水蓄能电站
上机架
中心调整
建议
Taishan pumped storage power station
upper frame
center adjustment
suggest