期刊文献+

交互式两阶段分位值水资源系统规划模型

ITFO:An Interactive Two-Stage Fractile Water Resources Management Model
下载PDF
导出
摘要 开发了一种交互式两阶段分位值优化(ITFO)模型,并将其应用于不确定条件下水资源系统规划问题。该模型将分位值优化方法引入随机规划模型中,用于处理目标函数和约束两侧的双重不确定性,同时体现决策者对水资源系统收益的偏好。结果表明:1ITFO模型可以有效解决水资源系统规划问题,得到不同可信度和分位值下系统收益和水资源分配量;2可信度θ与系统收益上界呈现反比关系,与系统收益下界呈现正比关系,即随着可信度θ的增大,系统收益值减小,同时系统收益区间变小,不确定性降低。3分位值pne与系统收益呈现反比关系。ITFO模型可以为决策者提供可行的水资源系统方案,使水资源系统分析更加符合客观实际。 In this study, a method of interactive two-stage fractile optimization (ITFO) model is proposed and applied to a water re- sources system planning problem. The fractile optimization method is combined into the stochastic programming model to deal with dual uncertainties in the objective function and constraints, and to reflect the preference for the system benefit. The results show that ①ITFO can effectively solve water resources system planning problem and help generate optimal solutions under various feasibilities and fractile values. ② The feasibility θ has an inverse relationship with the upper bound of system benefit, but is proportional to the lower bound of system benefit, i.e. the interval value of system benefit decreases as feasibility increases, leading to uncertainty decrease. ③The fractile value pne has an inverse relationship with the system benefit. ITSPF can provide feasible schemes for decision-makers and make the water resources system more reasonable and practical.
出处 《中国农村水利水电》 北大核心 2016年第7期83-85,91,共4页 China Rural Water and Hydropower
基金 中央高校基本科研基金(2015XS98)
关键词 水资源 分位值 不确定性 随机规划 water resources fractile value uncertainty stochastic programming
  • 相关文献

参考文献10

  • 1赵喜富,茅樵,曹升乐,解文静.济南市“五库连通工程”水资源优化配置研究[J].中国农村水利水电,2015(7):47-49. 被引量:5
  • 2解河海,查大伟.大藤峡水利枢纽水资源优化调度研究[J].中国农村水利水电,2015(6):48-51. 被引量:1
  • 3曾雪婷,李永平.不确定性规划在水资源管理中的运用与优势[J].水利发展研究,2013,13(7):37-39. 被引量:2
  • 4Kong X M, Huang G H, Fan Y R, et al. Maximum entropy- Gumbel-Hougaard copula method for simulation of monthly stre- amflow in Xiangxi river[J]. China. Stochastic Environmental Re- search and Risk Assessment, 2015,29(3):833 846.
  • 5Huang G H, Loucks D P. An inexact two-stage stochastic pro- gramming model for water resources management under uncer- tainty[J]. Civil Engineering and Environmental Systems, 2000, 17(2):95-118.
  • 6Liu B. Uncertainty Theory[M]. Springer Berlin Heidelberg, 2007.
  • 7Kong X M, Huang, G H Fan, et al. A duality theorem-based algorithm for inexact quadratic programming problems: Applica- tion to waste management under uncertainty[DB/OL]. Engineering Optimization, 2015, Online.
  • 8Wang S, Huang G H. Interactive two-stage stochastic fuzzy programming for water resources management[J]. Journal of Envi- ronmental Management, 2011,92(8) : 1 986- 1 995.
  • 9Dubois D, Prade Ho Possibility Theory: An Approach to Com- puterized Processing of Uncertainty[M]. New York, NY, USA: Plenum Press, 1988.
  • 10Torabi S A, Hassini E. An interactive possibilistic programming approach for multiple objective supply chain master planning[J]. Fuzzy Sets and Systems, 2008,159(2):193-214.

二级参考文献12

  • 1裴源生,赵勇,张金萍.广义水资源合理配置研究(Ⅰ)——理论[J].水利学报,2007,38(1):1-7. 被引量:40
  • 2运筹学教材编写组.运筹学[M].北京:清华大学出版社,1990.
  • 3P Kart. Stochastic Linear Programming [ M ]. Springer-Verlag, 1976.
  • 4J M Stancu-Minasian and M J Wets. A research bibliography in stochastic programming(1055--1975) [ J ]. Operations Research, 1976, 24: 1078-1119.
  • 5R E Bellman and L A Zadeb. Decision-making in a fuzzy environ- ment[ J ]. Management Science, 1970, 17 : 141-164.
  • 6中水东北勘测设计研究有限责任公司.大藤峡水利枢纽项目建议书[Z].2005-04.
  • 7中水珠江勘测设计有限公司.大藤峡水利枢纽项目建议书补充报告[Z].2005.
  • 8王光谦,魏加华.流域水量调控模型与应用[M].北京:科学出版社,2007.
  • 9王偲,窦明,张润庆,汤勇,张远东.基于“三条红线”约束的滨海区多水源联合调度模型[J].水利水电科技进展,2012,32(6):6-10. 被引量:13
  • 10谢涛,陈火旺.多目标优化与决策问题的演化算法[J].中国工程科学,2002,4(2):59-68. 被引量:59

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部