摘要 针对里伍铜矿采空区安全问题和下一步矿体回采安全问题,分别提出了分级尾砂胶结充填方案、全尾砂胶结充填方案和废石胶结充填方案,并且对3个充填方案从系统建设成本、主要技术经济指标和方案优缺点等方面进行了系统对比分析,结果表明,分级尾砂胶结充填方案建设成本627.77万元,充填成本39.00元/t,均优于其他备选方案,且优点明显,最终确定实施分级尾砂胶结充填方案。 Aimed at the safety problems of goal and next min- ing, three cemented filling schemes were put forward, inclu- ding total tailings filling system, classified tailings filling system and waste rock filling system. And the three schemes were systematically compared and analyzed from construc- tion cost, main techno-economic indexes, advantages and disadvantages. The results showed that the construction cost and filling cost of classified tailings filling system were re- spectively 6.2777 million RMB and 39 RMB per ton with ob- vious advantages, which both were superior to other schemes'. Therefore, the classified tai[ings filling system was determined for the mine.
出处 《矿业研究与开发》 CAS 北大核心 2016年第7期6-9,共4页 Mining Research and Development
关键词 采空区治理 充填系统 全尾砂 分级尾砂 废石胶结充填 Treatment of goal, Filling system, Total tail-ings, Classified tailings, Cemented waste rock filling
  • 相关文献

参考文献13

二级参考文献70

共引文献116

同被引文献37

引证文献4

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部