期刊文献+

P2P网络借贷投资者接受模型分析与构建 被引量:2

Analysis and construction of investor acceptance model of P2P lending platform based on the integration of TAM and TTF
下载PDF
导出
摘要 在分析技术接受模型(technology acceptance model,TAM)和任务技术匹配(task-technology fit,TTF)整合的必要性的基础上,运用基于TAM和TTF整合的信息技术接受模型,采取二手资料和开放式问卷调查获取影响因素,构建出P2P网络借贷投资者接受模型。模型研究表明:感知风险是阻碍投资者使用P2P平台进行投资的最重要的影响因素。感知有用、感知收益和感知信任从一定程度上能促进投资者使用P2P平台进行投资。政策法规、P2P平台的质量、主观规范、感知行为控制对P2P平台投资也会产生一定的影响。同时,结合本研究模型提出了针对P2P平台应用和推广的建议。 The necessity of integrating technology acceptance model( TAM) and task-technology fit( TTF) was analysed. An information technology acceptance model based on the integration of TAM and TTF was employed. Influential factors affecting peer-to-peer platforms were obtained from second-hand data and open questionnaires. An investor acceptance model of P2 P lending platform was constructed. The simulation results indicate that perceived risks are the major influential factors affecting the investors' using P2 P,whereas perceived usefulness,perceived benefits and perceived trust can promote the investors' investment on P2 P in a certain degree. Policies and legal regulations,the quality of P2 P platforms,subjective norms and perceived behavioural control are also influential factors affecting the investment on P2 P. Approaches are proposed to promote the application of P2 P in accordance with the constructed model.
作者 邱碧珍
出处 《福建工程学院学报》 CAS 2016年第3期289-294,共6页 Journal of Fujian University of Technology
关键词 P2P 网络借贷 技术接受模型 任务技术匹配 peer-to-peer(P2P) on-line lending(platform) technology acceptance model(TAM) task-technology fit(TTF)
  • 相关文献

参考文献7

二级参考文献100

  • 1高平,刘文雯,徐博艺.基于TAM/TTF整合模型的企业实施ERP研究[J].系统工程理论与实践,2004,24(10):74-79. 被引量:42
  • 2RIVARDS,RAYMOND L,DAVID.Resource-based View And Competitive Strategy:An Integrated Model of The Contribution of Information Technology to Firm Performance[J].Journal of Strategic Information Systems,2006,15:29-50.
  • 3ALOINI D,RICCARDO D,VALERIA M.Risk Manage -Ment in ERP Project Introduction:Review of The Literature[M].Information & Management,2007,44:547-567.
  • 4VERNER J,COX K,BLEISTEIN S J.Predicting Good Requirements for in-House Development Projects[G]//.In:Proceedings of The 2006 ACM/IEEE International Symposium on Empirical Software Engineering.Rio De Janeiro,2006:154-163.
  • 5BRYNJOLFSSON E.The Productivity Paradox of Information Technology[M].Communications of The ACM,1993,36(12):66-77.
  • 6URBACH N,SMOLNIK S,RIEMPP G.The State of Research on Information Systems Success-A Review of Existing Multidimensional Approaches[J].Business & Information Systems,Engineering,2009,1(4):315-325.
  • 7FETTKE P.State of The Art of The State of The Art-A Study of The Research Method Review in The Information Systems Discipline[J].Wirtschaft Sinformati,2006,48:257-266.
  • 8DELONE WH,MCLEAN ER.The Delone and Mclean Model of Information Systems Success:A Ten-year Update[J].Journal of Management Information Systems,2003,19(4):9-30.
  • 9ZANI W.Blueprint for MIS[J].Harvard Business Review,1970,48(6):95-100.
  • 10ROCKART J R.Chief Executives Define Their Own Data Needs[J].Harvard Business Review,1979,57(2):81-93.

共引文献140

同被引文献10

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部