摘要
地下轨道交通(地铁)机电设备安装与土建预埋件在建设规划中,提前安排好,这对地铁降噪、方便更换设备等,以保证其天天安全运营非常关键。本文就地铁车站施工时对机电设备安装的预留孔位、基础预埋件安装方法,易出现的问题及其危害进行了研究分析,并提出了具体的质量控制方案及措施。
It is important to plan in advance on Underground Rail Transportation(Subway) 's place for equipment and embeded parts,in order to control noise and facilitate maintanence.This article studys and analysis positioning of reserved hole,pre-embeding method,frequent problems and its dangerousity,then it gives detailed quality control suggestion and measures.
出处
《工业技术创新》
2016年第3期494-497,共4页
Industrial Technology Innovation