期刊文献+

实现倾斜方向连续卸压的留煤柱开采保护层技术 被引量:2

Coal pillar remaining protective coal seam mining for inclined successive and sufficient pressure-relieving
下载PDF
导出
摘要 针对现有保护层开采技术现状,提出了实现倾斜方向连续卸压的留煤柱开采保护层技术。通过理论分析认为当煤柱内部超过88%的范围为塑性区时,煤柱存在发生突变、失稳的可能性,给出煤柱留设尺寸的计算方法。在此基础上,利用煤柱保持稳定的时间,提出相应的回采工艺,对卸压效果进行分析。并结合实际工程背景对煤柱的留设及回采工艺参数进行了计算,认为在减小煤柱尺寸的前提下,可实现被保护层倾斜方向的连续卸压。 Aiming at current situation of protective coal seam mining,a coal pillar remaining realizing protective coal seam mining technology is proposed to realize inclined successive and sufficient pressure- relieving. According to theoretical analysis abrupt change and instability may happen when plastic zone exceed 88% in the coal pillar,and the computational methods of coal pillar layout size is deduced. On this basis,recovery technology is proposed according to coal pillar steady time and the pressure-relief effect is analyzed. Finally,combining with the practical engineering condition,the coal pillar layout and recovery technology parameter are calculated and inclined successive and sufficient pressure-relief in protected seam can be realized on the premise of decrease in coal pillar size.
出处 《煤炭工程》 北大核心 2016年第7期4-7,共4页 Coal Engineering
基金 国家自然科学基金资助项目(51404270) 新疆工程学院科研基金项目(2015xgy35171)
关键词 连续卸压 被保护层 保护层 留煤柱 突变理论 successive and sufficient pressure-relief protected seam pressure-relief coal pillar remaining abrupt change theory
  • 相关文献

参考文献9

二级参考文献46

共引文献399

同被引文献29

引证文献2

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部