摘要
描述了煤炭深加工项目煤储运系统工艺,探讨了施工中发现井点降水、基坑开挖监测、料仓主体结构施工、煤廊构架吊装和冬季施工等技术难点,研究制订了针对性措施,以加快工程施工进度,保证了施工安全质量。
The process for coal storage and handling system in a coal deep processing project are described. The technical challenges identified during construction are discussed,including well-point dewatering,foundation pit excavation monitoring,silo body construction,coal trestle frame lifting and construction in winter. Specific measures are developed in order to speed up the construction and ensure construction safety and quality.