半逆作法在基坑工程中的应用——特房筼筜·温莎公馆基坑工程实例

Semi top-down method applied in the excavation project——Take Tefang Yundang Wensha Mansion as an example
下载PDF
导出
摘要 为解决锚杆(索)超红线问题,考虑主楼的节点工期要求,特房筼筜·温莎公馆基坑工程采用以下多种支护形式:半逆作法、悬臂桩支护、桩撑支护、桩锚支护等,本文介绍了设计思路及监测结果。随着各地区限制锚杆(索)超红线文件的出台,这可以为解决锚杆(索)超红线问题提供一些启发。 To resolve the problem of soil nail / tieback beyond the red line,considering the requirement of node construction in main building,the excavation of Tefang Yundang Wensha Mansion adopted the following forms of support: semi top- down method,cantilever pile support,pile brace support and pile anchor support. This paper introduces the design thoughts and monitoring results. The monitoring results show that using semi top- down method can satisfy the allowable design limits,which provide insights to resolve soil nail / tieback beyond the red line.
作者 王华钦
出处 《福建建设科技》 2016年第4期3-6,共4页 Fujian Construction Science & Technology
关键词 锚杆(索)超红线 多种支护形式 半逆作法 soil nail/tieback beyond the red line multiple support forms semi top-down method
  • 相关文献

参考文献2

  • 1高大钊.岩土工程勘察与设计——岩土工程疑难问题答疑笔记整理之二[M].北京:人民交通出版社,2014.
  • 2中华人民共和国住房和城乡建设部.JGJ120-2012建筑基坑支护技术规程[S].北京:中国建筑工业出版社,2012.