摘要
结合上海某办公楼项目的工程概况及地质条件,介绍了考虑地铁区间隧道保护的基坑支护方案,并采用有限元软件进行了施工数值模拟,指出该项目采取分区顺作方案,取得了良好的施工效果。
Combining with the office building engineering project conditions and geology conditions in Shanghai city,the paper introduces the foundation support scheme by taking metro running tunnel protection into consideration,carries out construction numerical simulation by applying finite element software,and finally points out that: it achieves good construction effect by applying sub-region construction scheme.
出处
《山西建筑》
2016年第20期53-54,共2页
Shanxi Architecture
关键词
深基坑
地铁
沉降量
有限元分析
deep foundation
subway
settlement volume
finite element analysis