摘要
根据南京机场线高架线路工程的实际情况,提出了架桥机、履带吊、门式起重机三种薄壁U型梁的架设方式,并对比分析了三种方式的优缺点,最终确定了薄壁U型梁的架设方案。
According to the overhead traffic lines along airport line of Nanjing City,the paper points out three kinds of erection approaches including the bridge erecting machine,crawler crane,and portal crane for the thin-wall U-shaped beam,undertakes the comparative analysis of their advantages and disadvantages,and identifies the erection scheme for the thin-wall U-shaped beam.
出处
《山西建筑》
2016年第20期166-167,共2页
Shanxi Architecture
关键词
薄壁U型梁
架设方式
履带吊
门式起重机
架桥机
thin-wall U-shaped beam
erection approach
crawler crane
portal crane
bridge erection machine